The Mandate just put in our thirteenth bore hole in about six years we’ve been here. We try and put two a year but we didn’t get to drill any last year. (Covid messed everything up!) We always consult the chairman of the village as to where they are put. They have all been put in strategic places so that clean water is available to everyone. So many people have had to walk miles each way to get just one ten liter can of water. Living without running water ourselves I would say there are many trips for those who need water. Thankfully we have a bore hole in front of our home and I have Raelee’s friends that earn money by filling my jeri cans as they are called. We go through 10-15 some days. Just think about how much you use for bathing, flushing, washing – clothes and dishes! Don’t forget cooking and drinking.
I can go into all the steps of drilling but I don’t want to bore you with technicality! Mainly the first step is to get a professionally trained Hydro-geologist to test the best place to put the well. Where the water is and the best way to get to it.

The hole is then drilled by a drilling machine and steel encased piping is put in. Then they test for how much water is there, how much can be pumped and at what rate.

After all the testing and agreement on the correct placement of a well the pipes on and then the pump is cemented in. It takes time to dry and then the base around the actual pump is poured along with a “ditch” or run-off gutter.



Then you have clean water and happy very people!

The concrete on this one just has to dry and it will be ready to pump water! You can tell how happy they are!